Planning permission vs building regulations: what you need

A plain-English guide to permitted development, building control and party wall agreements for London homeowners.

Planex team7 min readUpdated October 2026
Calculate my price

Planning permission and building regulations are two different things — and most projects need at least one of them. Here's a plain-English overview for London homeowners. Rules change and every borough is different, so always check your specific case before starting.

Planning permission: what it covers

Planning is about how a building looks and how it affects its surroundings — size, appearance, use and impact on neighbours. Many house extensions and loft conversions can be built without a full application under permitted development rights, within strict limits.

Permitted development — key limits for houses

  • Single-storey rear extensions: generally up to 3m deep for attached houses and 4m for detached houses, and up to 4m high. Larger extensions (up to 6m / 8m) may be possible through the prior approval process.
  • Loft conversions: generally up to 40m³ of extra roof space for terraced houses and 50m³ for semi-detached and detached houses, with no dormers on the roof slope facing the road.
  • Flats and maisonettes don't have permitted development rights — extensions to flats usually need full planning permission.

When you'll almost certainly need permission

  • Your home is in a conservation area or is listed (listed buildings also need listed building consent for most internal changes).
  • Your borough has an Article 4 direction removing permitted development rights — common across London.
  • The project exceeds the permitted development limits.

Even when permitted development applies, we recommend a Lawful Development Certificate from the council — it's proof the work was lawful, which buyers' solicitors will ask for.

Building regulations: how it's built

Building regulations are about safety and performance: structure, fire safety, insulation, ventilation, drainage and electrics. Unlike planning, they apply to almost every significant project — including ones that don't need planning permission.

  • Extensions, loft conversions and removing load-bearing walls
  • New bathrooms or kitchens involving new drainage or electrical circuits
  • Replacement windows, boilers and electrical work, which must be done by registered installers (e.g. FENSA, Gas Safe, NICEIC) who self-certify

Work is signed off by a building control body — either your local council or a registered building control approver — and you receive a completion certificate. Keep it safe: you'll need it when you sell.

The Party Wall Act

If your work affects a wall shared with a neighbour, or you're digging foundations close to theirs, the Party Wall etc. Act 1996 requires you to serve notice — generally two months before work on a party wall and one month before excavation. If your neighbour doesn't consent, surveyors agree a party wall award before work can start.

How we handle it

Our in-house design team prepares the drawings, checks permitted development, submits applications where needed, coordinates structural engineers and building control, and arranges party wall notices — so you don't have to navigate it alone.

Want a price for your project?

Use our calculator for an instant range, or book a free survey for a fixed, itemised quote.

Free consultation

Let's build something beautiful.

Free consultation, free site visit and a fixed, itemised quote. We call back within 15 minutes.

020 3488 6505
Hi! 👋 Planning a renovation? Message us — we usually reply within minutes.
Telegram Call us