Commercial · Harrow

Pool Gallery to Changing Rooms, Independent School

A disused viewing gallery above a school swimming pool, enclosed and converted into bright, durable changing rooms.

Calculate price

Project scope

  • Steel-stud partitions and a curved wall following the line of the gallery
  • Moisture-resistant boarding, skim and specialist paint for a pool environment
  • New ceilings, LED downlights and fire doors
  • Easy-clean flooring, skirting and finishing throughout

Challenges & solutions

01

Working above a live pool

The pool was protected and access planned around the school timetable, so lessons carried on.

02

A curved gallery

The new walls follow the original curve of the balcony — framed and boarded on site, not forced straight.

03

Humidity

Every board, fixing and finish was chosen for a warm, damp pool hall.

The result

Unused space turned into practical changing rooms — clean, bright and built for daily school use.

Next project
Period Townhouse Refurbishment

Free consultation

Planning something similar?

Free consultation, free site visit and a fixed, itemised quote. We call back within 15 minutes.

020 3488 6505
Hi! 👋 Planning a renovation? Message us — we usually reply within minutes.
Telegram Call us